Rebulding after Qake: 37 Projects have been completed under good supervison !

What is the Progress of Emergency Earthquake Assistant Project, Guideline by ERMC
Nirman Sanchal Kathmandu | ERMC is one of the sepecific rebuilding consaltancy. It has successfully completed consulting services for more than 4 dozens of projects in year 2018.

Similarly, at least half dozens of project is under final stages which are expected to be completed within December 2018.  

The project name Emergency Earthqake Assitant Project, immidiate after Gorkha qake 2015, distributed by NRA (Nepal Reconstruction Authority) on Rubuliding of damages schools are going to be completed and handovered within six month, said NRA . 

Followings are the major completed projects in 2018 of ERMC

DSC for feasibility study
ERMC has Design and Supervision Consultant (DSC) for Feasibility Study, Detailed Engineering Design and Construction Supervision of Small Town Water Supply and Sanitation Sector Project in Narayan Municipality-Dailekh, Shiva Nagar-Kailali, Bhasi- Kanchanpur and Dashrath Chand Nagar Municipality-Baitadi (Batch I, Package I) (ADB Grant No. 0157 (NEP)), Asian Development Bank and Town Development Fund

What things are involved here ?
ERMC Design and Supervision Consultant (DSC) for Feasibility Study, Detailed Engineering Design and Construction Supervision of Small Town Water Supply and Sanitation Sector Project in Sukhad, Rukum, Sitalpati – Salyan .

Like that Chandrauta Municipality Town Water Supply Project (Batch II, Package I) (ADB Grant No. 0157 (NEP)), Scoping and Preparation of Project Documents for Additional Financing (Loan No. 3157 NEP SF), Second Small Towns Water Supply and Sanitation Sector Project (SSTWSSSP) and Benefit Monitoring and Evaluation (BME) and Preparation of Report in Five Towns Projects (Indrapur, Karahiya Makrahar, Baglung, Lamahi and Byas Municipality), Asian Development Bank and Town Development Fund also.

DOLIDAR FOR the Preparation of Rural Reconstruction

ERMC To Support and Assist Department of Local Infrastructure Development and Agricultural Roads (DoLIDAR) for the Preparation of Follow on Project of Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP) – 2, RRRSDP/PCU, Government of Nepal, Panchthar, Illam, Jhapa, Morang, Sunsari, Dhankuta, Dolakha, Sindhuli, Chitwan, Sindhupalchok, Kavrepalanchowk, Kathmandu, Lalitpur, Bhaktapur, Parbat, Rukum, Rolpa, Manang, Mustang and Dadeldhura District of Nepal. (Feasibility study and detail design of approx 1000 km road)

Supervision of Hydromechanical
Design and Supervision of Hydromechanical Works of Headworks, Sikta Irrigation Project, DoI (33,766 ha), Banke District, Department or Irrigation, Sikta Irrigation Project.

LRAMS Package

Local Road Asset Management Support (LRAMS) Package: RAP3/2013/014-Dailekh), Rural Access Programme-Phase 3, Dailekh District.

DSC04 for Detailed Design Engineering

Design and Supervision and Management Consultant (DSC04) for Detailed Design Engineering including preparation of Tender Document and Construction Supervision of Centralized Wastewater Treatment Plants (WWTP), Intercepting Sewer Lines, Neighborhood Sewer Network and Decentralized Wastewater Treatment Systems (DWaTS) in Kathmandu Valley, Kathmandu Metropolitan City, Lalipur Sub Metropolitan City, Bhaktapur Municipality, Thimi Municipaity, Kirtipur Municipality including surrounding VDCs and Municipality in Kathmandu Valley, Nepal, Kathmandu Upatyaka Khanepani Limited, Project Implementation Directorate.

Rehabilitation of Bhairahawa Pavement Works by ERMC
Nepal India Regional Trade and Transportation Project (NIRTTP), Rehabilitation of Bhairahawa Pavement Works and Construction of Steel Truss Shed at Birgunj ICD; Contract No: NIRTTP/PCO/NITDB/S/QCBS-16, Government of Nepal (GoN), Ministry of Infrastructure &Transport, Department of Roads, Nepal.

IEE Study of Ikhuwa Khola Hydropower Project

ERMC has Feasibility Study and Initial Environmental Examination (IEE) Study of Ikhuwa Khola Hydropower Project, Sankhwasabha District (30 MW), Sankhwasabha District, Department of electricity Development (DOED), Ministry of Energy.

Study of Lower Chepe Hydropower Project
It has ben Feasibility Study and Initial Environmental Examination (IEE) Study of Lower Chepe Hydropower Project, Lamjung & Gorkha District (14.47 MW), Lamjung & Gorkha District, Department of electricity Development (DOED), Ministry of Energy.

ERMC Studied of Maiwa Khola Hydropower Project
ERMC has Detail Engineering Study of Maiwa Khola Hydropower Project, Taplejung District (13.50 MW), Taplejung District, Department of Electricity Development (DOED), Ministry of Energy.

Detailed Design and Supervision of Lumbini Clean Public Transport Project

Project Management, Detailed Design and Supervision of Lumbini Clean Public Transport Project, Lumbini, Kapilbastu, Ministry of Culture, Tourism and Civil Aviation, Lumbini.

It is also the project of EMRC

Preparation of Powerhouse Design Guidelines of Hydropower Projects, Nepal, DoED.

Inspection Guidelines for Hydropower Plants

ERMC Preparation of Inspection Guidelines for Hydropower Plants, Substations & Transmission Lines, Nepal, DoED.

Design of Inkhu Khola Small Hydropower Project

ERMC Detailed Engineering Design of Inkhu Khola Small Hydropower Project (21.4 MW), Solukhumbu District in Nepal under Department of Electricity Development (DoED), Solukhumbu District.

Design of Lower Hongu Khola Small Hydropower Project

It has Detailed Engineering Design of Lower Hongu Khola Small Hydropower Project 30.20 MW), Solukhumbu District in Nepal under Department of Electricity Development (DoED), Solukhumbu District.

ESIA of Karnali
Anoter project of ERMC is that Environmental and Social Impact Assessment (ESIA) of Karnali (Chisapani) Multipurpose Project (10,000 MW), Nepal, DoED.

What has been at Upper Jhimruk Storage Project
ERMC has Pre-feasibility Study of Upper Jhimruk Storage Project, Pyuthan District in Nepal under Department of Electricity Development (DoED), Pyuthan District.

These are the Project Support Consultant
These are theProject Support Consultant, which is Pro-Poor Urban Regeneration Pilot Project (PURPP), Grant No. JSDF TF015780, Contract No. PURPP/S/QCBS-4, Lalitpur Sub-Metroplitan City/World Bank.

These project are also important wchic is construct by EMRC

Environmental and Social Impact Assessment of Isimba Hydropower Project (183.2 MW) for Impact on the Kalagala Off Set Area (Addendum), funded by the World Bank under the Energy for Rural Transformation Project – III under, Ministry of Energy and Mineral Development, The Republic of Uganda, Ministry of Energy & Mineral Development.

Design of Kathmandu Urban Transport Project
These are the Kathmandu Sustainable Urban Transport Project: Design and Supervision Consultant for various Works under KSUTP (DSC-KSUTP), Loan 2656 & Grant 0212/0239-NEP (Contract No. KSUTP/S/QCBS/3, Asian Development Bank.

Design and Preparation of DPR
It has been feasibility Study, Detailed Engineering Survey, Design and Preparation of DPR, Environmental and Social Study for Improvement to Double Lane Bituminous Standard, Contract Packaging and Preparation of Bidding Documents i) Kohalpur – Surkhet (Bangesimal) Road (Ratna Highway, H012) (80.534 Km) ii) Butwal – Pokhara Road Section (Siddhartha Highway, H10) (139.061 Km), Contract Identification No.: FCB/02//072-73), DoR/Foreign Cooperation Branch, Rupandehi, Palpa, Syangja, Kaski, Banke, Bardiya and Surkhet Districts of Nepal.

ERMC Detail Survey of Railway Line for Inaruwa

ERMC Detail Survey and Design of Electrified Railway Line for Inaruwa – Kakarbhitta Sector of Mechi – Mahakali Railway and Itahari – Biratnagar Link (127.290 Km), Railway and Monorail Development Project, Department of Railways, Ministry of Physical Infrastructure and Transport.

Project for Agricultural Commercialization and Trade
Consultancy Services for Technical Assistance for Project for Agriculture Commercialization and Trade (RFP No.: PACT-39-SBC-CF-PACT-AF/S/QCBS/40/2013), Project for Agricultural Commercialization and Trade (PACT) Credit / Grant No: 5180-NEP/H813-NP.

Audio Visual Survey in Sample basis of Batch

CDA baseline Study including Audio Visual Survey in Sample basis of Batch – X Schemes (RWSSIP/S/QCBS-020) (Loan/Credit/Grant No.: Credit: IDA 5446-NP, Grant: IDA H945-NP), RWSSFDB / World Bank/IDA

EIA of Num-Kimanthanka Road by ERMC

Environment Impact Assessment (EIA) of Num-Kimanthanka Road (72 km) of North South (Koshi) Highway (GESU/NS (KH)-01/066/067), Sankhuwasava District, DOR/GESU.

Environment Improvement Project
TA-7936 NEP: ERMC Preparing the Kathmandu Valley Urban Environment Improvement Project (43524-012), Kathmandu, Nepal, ADB.

Detailed Project Report of Barabis
Preparation of Detailed Project Report of Barabis VDC Betalmandu Trishakti Juwapani Jayabageswori to Kanda VDC Jadibuti Pahunch Marg (18.0 km),Contract No.DDC/CS/01/072/73, District Development Comitte, District Technical Office.

ERMC Reported preparation of Manang

It has been Feasibility Study and Report preparation of Manang (chame) – Muktinath – Kagbeni – Ekalbhattii – Sangta Section of Manang – Mustang – Dolpa – Jumla Road (180 Km),Nepal.
Detail Design of Roads and Report Preparation

ERMC Detailed Engineering Survey, Detail Design of Roads and Report Preparation of Package No.: PMEU/337159/073/74 DPR-33, 1.1) Sainikhan Muichula Sadarmukam Sadak, Baitadi 1.2) Bagarkot Bhageshwor Rupal Sadak, Dadeldhura 1.3) Kolti Bhudinanda Partakiya Sadak, Bajura 1.4) Bajura Kalapani Badhpata Pandhara Sadak, Bajura 1.5) Churemarg-9 Patapur, Barne, Santinagar Mahamai Letang Sadak, Jhapa 1.6) Danda Khahare Marimmar Jakhani Badiman Pachpokhari Chanaute Pipalmadi Sadak, Sindhuli 1.7) Manthali Saghutar Sadak, Ramechap, Department of Roads, Babarmahal, Kathmandu.

ERMC detailed engineering survey of diffrent roads
It has been Detailed Engineering Survey, Detail Design of Roads and Report Preparation of Package No.: PMEU/337159/073/74 DPR-23, 1.1) Daab Khaptad Paryatakiya Sadak, Bajura (15Km) 1.2) Bagar Khagaun Sokar Sadak, Achham (18Km) 1.3) Jayagadh Sugali Darna Sula Sadak, Achham (18Km) 1.4) Silgadhi Sanfebagar Pahalmansingh Marga Motorbato Starronatti, Achham (30Km) 1.5) Chisapani Solta Jangleghat Mangalsen Sadak, Achham (15Km) 1.6) Sanfe Hattikot Kushkot Thanti Rhisidaha Malika Sadak, Achham (16Km), Department of Roads, Babarmahal, Kathmandu.

Evaluation of Road Maintenance Works

ERMC has been Monitoring and Evaluation (M&E) of Road Maintenance Works executed by Road Agencies, [Road agencies under DOR (42 Agencies)], Contract No.: M&E / 01/2073/074, Eastern and Central Development Regions, Road Board Nepal.

Master Plan of Seven Selected Destinations
ERMC has Preparation of Master Plan of Seven Selected Destinations in Each of 7 Federal State Including Preparation of DPR of Cultural Museum in each state, Ministry of Culture, Tourism and Civil Aviation.

ERMC has conducted Remittance & Life Insurance
It has been Conduct Study on Effectiveness / Impact on Jeevika Including Remittance & Life Insurance (RWSSIP/S/QCBS-035), RFP No.: RWSSIP/S/QCBS-035; Credit: IDA 5446-NP Grant: IDA H945-NP, RWSSFDB.

Water Supply Structures
ERMC has Water Supply Structures Construction and Supervision Training (Ferro Cement Tank Construction) for Wash Technician (WY) – Implementation phase of Batch X, RFP No.: RWSSIP/S/FBS-031, Credit: IDA 5446-NP, Grant: IDA H945-NP, RWSSFDB/World Bank.

ERMC Studied for Kathmandu Naubise Mugling Road section

It has been Environmental and Social Study for Kathmandu (Nagdhunga) Naubise Mugling and Kakarbhitta - Pathalaiya Section Road and Bridges, Central and Eastern Development Region of Nepal, NIRTTP, Foreign Cooperation Branch, DoR / World Bank.

Supervision of Town Development Fund

Construction Supervision of Birendranagar Bus Park (Project Code No. K3SL-023-CS/K3G-011-CS) Surkhet, Town Development Fund, Birendranagar, Surkhet, Town Development Fund.

Food Security Project in10 District

End line Beneficiary Results Assessment (BRA) and Community Score Card (CSC) Survey of Agriculture and Food Security Project (AFSP), 10 District (Far Western Region: Bajura, Dadheldhura, Darchula, Doti; and Mid-Western Region: Dailekh, Jajarkot, Jumla, Pyuthan, Rukum, Surkhet), Agriculture and Food Security Project (AFSP)/ World Bank

Among of them projects, ERMC has completed and handover the few school building design and supervised in different district under EEAP (Earthquake Emergency Assistance Project) and financed by ADB. Which are provided as

 

List of Handover School to SMC

 

 

....

Thursday, 11th Nov
 

 

 

 

 

 